目录 一、工程概况 ···································································2 二、编制依据· ···································································2 三、降水方案选择·······························································2 四、井点降水相关计算·························································3 五、主要降水设备·······························································6 六、施工工期·····································································7 七、井点施工方法·······························································7 八、质量标准及质量保证措施················································8 九、危险点分析································································10 十、安全生产及文明施工措施···············································10 十一、环保措施································································11 一、 工程概况 本期设计为2×600MW亚临界汽轮发电机组。 工程地质情况:本工程持力层采用③圆砾层做持力层,③圆砾,层顶一般埋深3.0m ~4.5m,一般厚度6.5m ~9.5m。④细中砂层,层顶埋深一般为10.0m ~13.0m。一般厚度5.0m~7.0m。⑤圆砾层分布于④层之下。层顶一般埋深15.0m ~18.0m。⑥粘土(残积土),褐色,稍湿,坚硬,覆于凝灰岩之上。最大厚度大于6.8m。 二、编制依据 《火电施工质量检验及评定标准》 《电力建设施工及验收技术规范》 《建筑施工计算手册》 临时土方开挖图纸 三、降水方案选择 该项目地处伊敏河畔,属砂砾地质结构,渗透系数为150m/天,容水量大,受降水影响地下水位波动变幅1-2m 。枯水期在-6m左右。而本工程大部分建筑物埋深在-6m,处于临界状态,丰水期就无法施工,本工程采取的措施是:采用明沟、集水井的方式进行作业层表面水的降水。在枯水期柱、基础底脚施工完、回填完,防止丰水期淹没,以减少降水施工的降水费用。基础埋深超过-6m的,采用局部井点降水。 本工程主厂房基础底标高为-5.0m,不须采用井点降水,而循环水泵坑及汽轮机基础底标高为-7.5m,可采用轻型井点降水。基础平面基底长度约为50m,宽度约为36m。基础埋深为见施工图,地面持力层为圆砾层,井点降水可以避免大量涌水、冒泥、翻浆,而且在砂砾地层中开挖基坑时,可防止流砂现象发生,渗流向下改善土的性质,使基底土质更加密实,结合本工程基础施工主要在枯水期期间,周期较长的特点,采用轻型井点降水法,沿建筑物环状布置进行人工降水。同时基坑二角设集水箱配合4台QY-3.5型潜水泵排除明水的方法。 四、井点降水相关计算 1、井点管的埋设深度 H≥H1+h+iL+l 式中 H——井点管的埋设深度(m) H1——井点埋设面至基坑底面距离(m) 取3.0m h—— 基坑中央最深挖掘面至降水曲线点的安全距离(m)取1.0m L—— 井点管中心至基坑中心的短边距离(m) 取27 i—— 降水曲线坡度 取1/10 l—— 滤管长度(m)取1.2 H≥3.0+1.0+27×1/10+1.2=7.9m 取8m 2、涌水量计算 Q=1.366K Q——井点系统总涌水量(m3/d) K——渗透系数(m/d)取150 H——含水层厚度(m)计算暂取11m R——抽水影响半径(m)计算取91 S——水位降低值(m)取1.2,地下水位取6.8m
2021-04-21 18:03:10 232KB 轻型井点降水方案
、工程概况 建设单位 ××建设发展有限公司(业主) 设计单位 ××建筑设计事务所 勘察单位 ××岩土工程勘察设计研究院有限公司 监理单位 ××工程建设咨询有限公司 总承包单位 ××建筑集团股份有限公司 桩基施工 ××地基工程公司(沪) 安质监站 ××安全质量监督站 人防质监站 ××民防工程质量监督站 建设地点 规划环区路以南,老槎浦以西, 工程名称 一期北块 承包总建筑面积 82521㎡(地下12756㎡) 1#4#楼建筑面积 12层,桩筏剪力墙结构,11559.33,11515.99 m2,其中一层地下人防面积1785.62m2 2#3#楼建筑面积 14层,桩筏剪力墙结构,9943.73,9943.73 m2,其中一层地下人防面积1276.42m2 5#9#楼建筑面积 11+1层,桩筏剪力墙结构,8278.36,8278.36 m2,其中一层地下人防面积1282.02m2 7#8#楼建筑面积 13+1层,桩筏剪力墙结构,7836.33,7836.73 m2,其中一层地下人防面积1095.34m2 地下车库 一层地下汽车库,钢筋砼框架结构7448.16㎡ 开工日期 2004.12.22 室外地坪 设计绝对标高4.500m,自然地坪绝对标高平均4.201m ±0.000 设计绝对标高4.950m,与自然地坪高差为0.75m 二、环境特征 本工程属滨海平原地貌类型,地形经平整基本平坦开阔,三面环河,施工外部通道为砼便道,场内道路施工前做3.5m宽,20㎝厚砼路。 根据工程地质勘察报告资料反映:基础以上主要由粘性土、碎石、碎砖及生活垃圾组成,下部为灰黑色粘性土,富含植物及有机质。场地浅部土层中的地下水属潜水类型,从工程地质报告获悉,地下水静止水位埋深在0.30~1.20米之间,相应绝对标高为3.65~2.70米; 土层号 土层名称 埋藏深度 (M) 粘聚力C(Kpa) 内磨擦角 ψ( 0) 渗透系数 K(㎝/s) ②1 褐黄色粉质粘土 0.6~2.4 23 18 2E-06 ②2 灰黄色淤泥质粉质粘土 2.0~3.7 16 17 2E-06 ②3 灰黄~灰色砂质粉土 0.9~6.5 4 33 2E-04 ③ 灰色淤泥质粉质粘土 2.9~6.0 17 15.5 3E-06 ④ 灰色淤泥质粘土 6.0~13.0 15 8.5 4E-07 三、施工条件 本工程地处城郊结合部,进出基地道路为临时砼路,这对道路保洁,保障工程材料(物资)设备运输非常不利。 (1)、做好临时道路: 根据施工现场平面布置图的要求布局,做好路基,贯通施工现场临时排水,做到施工现场畅通,不留水坑,并符合文明施工措施的要求。 (2)、临时用电: 现场北面设有800KV总配电室,根据本工程施工特点,施工用电从总配电室内分二路引至施工现场,设二只总箱,按规定埋设临时用电线路。现场输电线路及配电箱内一律按TN-SL相五线进行布线布置。 (3)、临时生活、生产用房搭设: 根据本工程场地特点,现场外设置生
2021-04-21 14:02:38 105KB 基坑降水 围护 土方施工方案
一、编制依据 1.1 18# 20#楼及地下车库结构施工图。 1.2 《工程地质勘察报告》。 1.3 国家和上海市关于建设工程、施工技术法规和安全技术标准。 1.4 本公司ISO9002质量认证体系文件《质量手册》。 二、工程概况 该工程位于南汇区康桥镇沿南村,平整后场地地形相对平坦,一般地面标高为3.5~3.8m之间,18#楼地下车库,20#楼自北往南依次排列,其中建(构)筑物平面西首有暗浜横贯。静止地下水位位于0.5~1.5m之间。18#.20#楼为承载桩基础。地下车库为抗拔桩基础,三个单体的地下结构拟采取同步基坑开挖和施工。基坑平面呈凸字形,基坑开挖深度约3.5~3.8m。 基坑施工拟采用1:0.75放坡结合轻型井点降水,同时位于暗浜处和临近19#楼位置需增减放坡比例并辅以细石砼挂网护坡。 三、地质状况与土体分布 据《地堪报告》表明基坑开挖范围内自上而下各土层分布情况与地 质壮况如下: ①层填土层:层厚约0.8m—1.0m. ②1层褐黄色粉质粘土,属中压缩性土,天然含水量28.8%,孔隙比0.82,渗透系数2.00E—6cm/s,埋深0.8—1.5m。 ②2层,灰黄色粉质粘土,天然含水量35.4%,孔隙比1.00,渗透系数3.50E—6cm/s,埋深1.5—3.0m。 ③1层,灰色淤泥质粉质捏粘土,属高压缩性,天然含水量39.9%,孔隙比1.12,渗透系数5.00E—6cm/s,埋深3.0—4.0m。基坑坑底位于本土层。 ③2层,灰色砂质粘土,中等压缩性土层,含水量28.8%,孔隙比0.81,渗透系数2.00E—4cm/s,埋深4.0—7.0m,渗透性好,井点滤水管埋设于该土层较为合理。 ③3层,灰色淤泥质粉质粘土,属高压缩性土,含水量42.4%,孔隙比1.19,渗透系数3.00E—6cm/s,含水量高但汽透性差,若将滤水管埋于此土层,,降水效果不甚明显。 四、轻型井点手面布置与降水周期 4.1基坑呈凸字多边形,放坡后上口总周长约380延长米,东西125m,南北宽60m,轻型井点沿周边封闭式布设6套。支管长度选用6m,滤水管0.8m,另地下车库西半部于北侧位于较20#.18#地下结构之间布设2套下沉式轻型井点,支管长度选用3m,滤水管0.8m。确保滤水管均埋设于③2层土体中,(详见平面布置4—1) 4.2待全部轻型井点安装完毕,正常出水10日后可进行基坑土方开挖施工。建议自东向西,南北一并进行。7#.8#井点在地下室底板全部浇筑完成并初凝后拆除,1#~6#井点尚待地下结构墙板施工完成并达到一定养护期后陆续拆除。基坑降水周期约40天。 五、施工准备 5.1审核和认定本施工方案。 5.2清除场地障碍,确保施工场地和道路畅通无阻。 5.3井点沟槽定位、放线、开挖。周边井点沟槽开挖深度1m,上口 宽1.5m,下口宽1m中间部位深2m,上口宽2.0m,下口宽1.0m。 5.4配置管径1.5寸的自来水,水压不小于0.2Mpa,90KW施工 用 电到现场。 5.5完成劳动力组织、材料、机具的进场工作。 5.6制定围护结构突发的变形、滑移、渗水等应急抢险措施。
2021-04-21 14:02:37 78KB 井点降水施工方案
强夯方案(降水加强夯)
2021-04-21 13:02:02 190KB 强夯方案(降水加强夯)
中建中心土方开挖与降水方案.doc
2021-04-21 09:03:55 6.58MB 施工相关
包括30年的气压、气温、相对湿度、降水、蒸发、风向风速、日照、地温数据
2021-04-19 14:05:26 67.28MB 气候 气温 降水 地温
TRMM 3B43月平均降水量Matlab读取,此读取也可用于3B42,3B42读取不需要转换降雨量,删去转换部分代码即可。内含注释
2021-04-01 21:03:45 1KB Matlab 3B43 降水 TRMM
1
Deecamp夏令营课题:AI降水预测 介绍及其新方向的探索,包括空气质量的预测模型 ConvSLTM2D\U-net\gcForest\GCN\GAN\Transformer模型的介绍
2021-03-19 19:46:05 39.3MB s's's's's's's's'
1
READ ME 文档链接 https://download.csdn.net/download/weixin_46629224/15750582 The goal of the NASA Global Land Data Assimilation System (GLDAS) is to generate optimal fields of land surface states and fluxes, by ingesting satellite- and ground-based observational data products, using advanced land surface modeling and data assimilation techniques (Rodell et al., 2004). GLDAS drives multiple, offline (not coupled to the atmosphere) land surface models, integrates a huge quantity of observation-based data, and executes globally at high resolutions (2.5° to 1 km), enabled by the Land Information System (LIS) (Kumar et al., 2006). Currently, GLDAS drives four land surface models (LSMs): Noah, Catchment (CLSM), the Community Land Model (CLM), and the Variable Infiltration Capacity (VIC). More information is available at the Land Data Assimilation Systems (LDAS) and Land Information System (LIS) websites. This document specifically describes the reprocessed data products of Version 2 of the Global Land Data Assimilation System (hereafter, GLDAS-2).
2021-03-13 09:02:20 196.84MB NASA 降水
1
降水1980-2015.txt 百度云盘下载链接
2021-02-24 20:02:06 144B 降水数据
1